3 ms·
A good comparison would be, what's the capital cost of a hypothetical fusion plant, compared to equivalent renewables (e.g. battery-backed solar/wind)
by HPsquared 6y ago
A good comparison would be, what's the capital cost of a hypothetical fusion plant, compared to equivalent renewables (e.g. battery-backed solar/wind)
- Veedrac 6y agohttps://arxiv.org/abs/1409.3540 https://arxiv.org/abs/1409.3540, Table 11 and Section 6.6.
- mikeyouse 6y agoYikes. For a 250MWe reactor: > *Assuming the higher cost estimate for the REBCO tape, the materials costs for ARC total $428M and the total fabricated component cost estimates total $5.56B. Given it's a novel nuclear project - it's probably safe to double/triple that cost estimate. Still wildly uncompetitive. That's actually really disappointing.