4 ms·
This one will be long ;) First of all, I would like to address the "haters". They rant on and on about how Scrum does not work, how its slowing them, unnecessa
by Malisman 6y ago
This one will be long ;)
First of all, I would like to address the "haters". They rant on and on about how Scrum does not work, how its slowing them, unnecessary meetings, etc. But if you look at what they say, it's always the same. They screw up, did not used it correctly. Its like when you want to cook a dinner, and burn yourself instead. Do you blame the fire? Or your stupid ass? :D
Scrum is not a silver bullet. It is not useful everywhere. For example for very small teams, who have like one, standalone responsibility, they know it well,... having Scrum is a waste. All they need is someone who will be able to give them (feature) request and they will do the job well. They are essentially self-organized.
However, for bigger teams, more complex product, more teams involved, this does not work anymore. One guys can THINK he is the owner because he coded that particular component, but there is another owner in second team and they clash. Often times people work like crazy, but the whole product does not work. All the pieces are there, but they cannot work together, gazillion ideas how to make it work, ego-driven heated discussion how we should use this library instead of this one. How everyone else is stupid because they do not integrate with us first, etc.
Scrum it is NOT a waste of time. Any fool that say a 3-4 hours during two weeks is great waste is total junior. That amount of time will never ever mean difference between "job well done" and "oh no, we fucked up again". If you are desperately thinking that the extra hour you spend coding instead of 4 daily standups (15 minute each) will save your product, then you already are on the edge of "crunch time" and doing something incredibly wrong.
Scrum - when implemented properly - provides many benefits:
1) Little to none micromanaging: The amount of micromanaging and reporting is lower, because your progress is visible without the need to actually report to the boss.
2) More option for your own time schedule: If the team evaluates that something is "hard" and give it huge number of storypoints (if you use SP), you are expected to work on it for some time and no-one will bother you like every half a day.
3) Predictability: business oriented people can easily "calculate" the time of delivery based on your predictions/estimates. You are shielded from that bullshit AND you are earning more trust every iteration, which means you have more option to do it your way.
4) Knowledge is shared: there are no silos, everyone potentially can work on anything within the competence area of the team. If someone gets sick, work just don't stop because the "owner" of the lib is out and we know nothing about it.
5) The power to stand up to the brass.
And others, I personally value those the most. And you can achieve some of those using different frameworks, but Scrum is proven to work the best all around. Also important note is that there are some basic rules for Scrum, but most of it is just recommendations. If you follow the book to the letter and do not adjust for your team, you are screwing yourselves.