4 ms·
Perhaps because that standard design didn't work out? Even Switzerland is shutting down nuclear plants and they managed to build the longest railroad tunnel of
by _nalply 6y ago
Perhaps because that standard design didn't work out?
Even Switzerland is shutting down nuclear plants and they managed to build the longest railroad tunnel of the world without budget overruns and half a year before due date.
- dispat0r 6y agoIn Switzerland it's a political decision same as Germany it has nothing todo with cost or the ability to run the plants.
- _nalply 6y agoThat's not so clear cut. Mühleberg near Berne has said that 2019 they didn't make profit, however the operator company BKW never published gains with that plant. https://www.bernerzeitung.ch/region/kanton-bern/das-akw-muehleberg-rentiert-2019-erstmals-nicht-mehr/story/31329779 https://www.bernerzeitung.ch/region/kanton-bern/das-akw-mueh... (paywalled)