> How about assessing their work and thats that. That’s not so simple with time and materials billing. If somethings taking too long to deliver or is being del
by AmericanChopper 6y ago
> How about assessing their work and thats that.
That’s not so simple with time and materials billing. If somethings taking too long to deliver or is being delivered to a low standard, it could easily be explained by having to deal with unplanned problems (which could also be entirely the clients fault), or it could just as easily be a contractor being slow and/or useless. I’ve worked as a contractor for quite a long time, and the number of complete dead weight contractors I run into is astonishing, and so is the number of projects that go way over budget due to poor planning from the clients. The metric you propose to track doesn’t do such a good job of telling the difference between these two things. This approach doesn’t do a terribly great job of that either, but delivering your work under the conditions chosen by your client is pretty much how it always is for contractors/consultants/freelancers. If they take things too far they won’t be able to attract the high quality contractors in any case.
- ThalesX 6y agoIt seems like you're trying to shield yourself from "complete dead weight contractors" which should be easy enough to spot. Certainly don't need a dystopian monitoring system to pluck up their monitors every 10 minutes, and have months of research on trailing data to come to the conclusion that a contractor is dead weight.
- AmericanChopper 6y agoI am myself a contractor so I’m not trying to shield myself from anything. They are however not simple to spot at all. I mean, I can spot them quite easily (at least I think I can). But I tend to work for people who hire me because they lack the skills that I have (or at least the skills I convince them I have). Their ability to evaluate the quality of my work, or reason about the problems I report to have with their systems, is close to non-existent. If I did terrible work it could take them quite a long time to notice, and then they’d just get themselves stuck trying to figure out if it was my terrible work, or the terrible work of a different contractor, or the terrible work of some of their employees, or simply the consequence of some other terrible work somebody else did 20 years ago. All of whom have a rather clear incentive to point the finger at each other. But don’t worry, whenever projects like that fail to deliver their planned value, there’s always some middle manager near by to say that the problem “should have been easy” to avoid.
- codesuela 6y agoIf the client does not have the competence to spot bad work, how are screenshots gonna help?
- AmericanChopper 6y agoThey can give an indication that work is at least being done, or perhaps the pace at which it’s being done. Which as I said isn’t a great metric either. But it does to some extent help with something which is legitimately a problem for a lot of businesses who end up being taken for a ride by unscrupulous contractors.
- confidantlake 6y agoThis. I am not sure I as an engineer could tell the difference with screenshots. How could someone without programming experience do so?