3 ms·
Sadly NuScale's pilot project is failing to hit the required numbers. Note that political opposition was not an issue, as it's on DoE land. I'd love to see som
by jasonwatkinspdx 6y ago
Sadly NuScale's pilot project is failing to hit the required numbers. Note that political opposition was not an issue, as it's on DoE land.
I'd love to see someone crack the code, but based on everything I've read, SMR is not going to be the silver bullet in changing nuclear's garbage ROI, unlike I hoped some years ago.