In 2019, some contractor got lucky while doing drilling works and scored a hit on both the main cable and the backup cable connecting the neighborhood of Berlin
by Xylakant 6y ago
In 2019, some contractor got lucky while doing drilling works and scored a hit on both the main cable and the backup cable connecting the neighborhood of Berlin-Köpenick to the grid - severing each of the three phases in both cables. Establishing the construction site, digging the hole and fixing the two 110KV cables took a mere 31 hours - and that includes 6 hours of setting time for the couplings used. This was pretty much the worst case scenario that could have happened. It's possible to maintain good uptime with buried infrastructure, as with most things it's a matter of spending the money to do so.