3 ms·
Should always include what's needed in the deployment and cost modeling, including whatever is needed so the South Texas nuclear plant doesn't have to shut off
by zamadatix 6y ago
Should always include what's needed in the deployment and cost modeling, including whatever is needed so the South Texas nuclear plant doesn't have to shut off the reactor due to the extreme cold.
The problem here is not being prepared for the cold not the choice of energy production method.