3 ms·
Essence: "A single associate assigned to a specific production line working between the production dates specified (12/14/2020 – 12/21/2020) was found to be usi
by prepperdev 6y ago
Essence: "A single associate assigned to a specific production line working between the production dates specified (12/14/2020 – 12/21/2020) was found to be using an improper torque wrench technique".
A case for using more robots, I guess.
- db48x 6y agoOr proper training.
- bryanrasmussen 6y ago>A case for using more robots, I guess. It turned out that the problem was a single line of code written by a junior developer who has since been fired!