3 ms·
HSR can be put underground. And since urban land is expensive, the rails are put underground. 90% of the Chuo Shinkansen will be underground[0]. The first secti
by SECProto 6y ago
HSR can be put underground. And since urban land is expensive, the rails are put underground. 90% of the Chuo Shinkansen will be underground[0]. The first section of the proposed Northeast Maglev in the US will be 75% underground[1]. The Hokkaido Shinkansen extension will be 76% tunnels (and only 7% at grade - the other 17% is bridges and viaducts) [2][3]
[0] https://en.wikipedia.org/wiki/Ch%C5%AB%C5%8D_Shinkansen https://en.wikipedia.org/wiki/Ch%C5%AB%C5%8D_Shinkansen
[1] https://en.wikipedia.org/wiki/Northeast_Maglev https://en.wikipedia.org/wiki/Northeast_Maglev
[2] https://en.wikipedia.org/wiki/Hokkaido_Shinkansen https://en.wikipedia.org/wiki/Hokkaido_Shinkansen
[3] pdf warning https://www.mlit.go.jp/common/000215188.pdf https://www.mlit.go.jp/common/000215188.pdf