3 ms·
NASA forgot how to make rockets: “Both NASA and contractor officials explained that nearly 50 years have passed since development of the last major space fligh
by Animats 6y ago
NASA forgot how to make rockets:
“Both NASA and contractor officials explained that nearly 50 years have passed since development of the last major space flight program—the Space Shuttle—and the learning curve for new development has been steep as many experienced engineers have retired or moved to other industries.”
- stretchcat 6y agoIt seems like a textbook case of 'use it or lose it.'
- Animats 6y agoThe Department of Energy maintains a large nuclear weapons establishment for "stockpile stewardship", so the US doesn't forget how to make nuclear weapons.[1] That already happened once with a material for fusion bombs called FOGBANK. The original manufacturing plant was shut down in 1989. In 2000, there was a demand for more FOGBANK, to refurbish old nuclear weapons. But attempts to make more of it failed. Attempts to make an alternative material failed. It took until 2008 to get production working again. "The new production scientists noticed that certain problems in production resembled those noted by the original team. These problems were traced to a particular impurity in the final product that was required to meet quality standards. A root cause investigation showed that input materials were subject to cleaning processes that had not existed during the original production run. This cleaning removed a substance that generated the required impurity. With the implicit role of this substance finally understood, the production scientists can control output quality better than during the original run." That's one way an institution forgets how to make something. There are other ways. [1] https://en.wikipedia.org/wiki/Stockpile_stewardship https://en.wikipedia.org/wiki/Stockpile_stewardship [2] https://en.wikipedia.org/wiki/FOGBANK https://en.wikipedia.org/wiki/FOGBANK
- Balgair 6y agoFrom Akin's Laws of Spacecraft Design: 39. (alternate formulation) The three keys to keeping a new human space program affordable and on schedule: 1) No new launch vehicles. 2) No new launch vehicles. 3) Whatever you do, don't develop any new launch vehicles. https://spacecraft.ssl.umd.edu/akins_laws.html https://spacecraft.ssl.umd.edu/akins_laws.html
- mbrodersen 6y agoApparently that wasn’t a problem for SpaceX. The problem with NASA is its corporate culture and political micro-management not lack of engineering skills.
- Animats 6y agoSpace-X had to start over from the beginning. They built a small booster, and then a bigger booster, and then a better version of the bigger booster, then an even bigger booster and a spacecraft. Took 18 years. That's longer than it took NASA in the 1950s and 1960s. NASA is trying to do a giant booster without anybody who built a booster recently.