3 ms·
I'm in AZ, so in the summer with everything running and under load - about $500/month (not including the 3d printers). That's why most of it is spun down atm.
by mech422 6y ago
I'm in AZ, so in the summer with everything running and under load - about $500/month (not including the 3d printers). That's why most of it is spun down atm. Gradually moving stuff from the blades to ODroid H2s to cut down on power.