8 ms·
And adopted the decimal calendar[0] which hopefully has fixed all the issues with current calendar. [0] https://medium.com/@duspom/proposal-for-a-base-10-calen
by rohan1024 6y ago
And adopted the decimal calendar[0] which hopefully has fixed all the issues with current calendar.
[0] https://medium.com/@duspom/proposal-for-a-base-10-calendar-b385071a219d https://medium.com/@duspom/proposal-for-a-base-10-calendar-b...
- ljm 6y ago> I believe this would be more than outweighed by the increased productivity of fewer weekends and longer periods of contiguous work between them. I don't think that's how productivity works
- Gibbon1 6y agoAs a peon I measure my productivity by the ratio of my free time to the actual work I do.