4 ms·
I think the main lesson here is that an MVP has to be small enough to be completed in a reasonable time. Even if it means boiling the product down to one single
by issa 6y ago
I think the main lesson here is that an MVP has to be small enough to be completed in a reasonable time. Even if it means boiling the product down to one single thing. Everything else can wait.
- dSebastien 6y agoClearly! Haha ;-)