If 1MW is the actual design limit, it should be possible to test the loop with a mock heat source. At this scale, you could pay for grid power ($40-60/hr). 100
by bob1029 6y ago
If 1MW is the actual design limit, it should be possible to test the loop with a mock heat source. At this scale, you could pay for grid power ($40-60/hr).
100MW would be a lot trickier to test due to infrastructure limitations, but you could probably figure something out with natural gas or propane burners.