You got the units wrong - 72.000 lbs is ~32 metric tons. Assuming carriages with two separate axle pairs that's 8 tons per axle, if two adjacent carriages share
by mschuster91 6y ago
You got the units wrong - 72.000 lbs is ~32 metric tons. Assuming carriages with two separate axle pairs that's 8 tons per axle, if two adjacent carriages share one axle pair a 4-carriage train has 5 pairs / 10 axles in total for a load of 128 tons it's 12.8 tons/axle.
Still, neither is something to take lightly (pun not intended), and I guess that building elevated makes construction a good chunk more expensive.
- hijp 6y agoWhoops, missed a zero when putting it into google perhaps. Here's the Hitachi Rail page with the trains, looks like four per car. http://italy.hitachirail.com/en/honolulu_381.html http://italy.hitachirail.com/en/honolulu_381.html So at 8 tons per axle its still within OP's truck limit. Anyway I'm just kvetching because our 20-mile light rail is taking 22-years to build, is half complete, and a billion dollars over budget (as of now).