3 ms·
Pretty much the latter: it was initially architected for 1x volume, but ended up handling 100x what was originally anticipated. So the engines were rebuilt a f
by howlgarnish 6y ago
Pretty much the latter: it was initially architected for 1x volume, but ended up handling 100x what was originally anticipated. So the engines were rebuilt a few times while the plane was in flight. As a bonus, while in production the system had to run 24x7 and upgrades were a fairly fraught manual affair involving hours of testing on the customer side.
The other major complication was that this was doing a lot of complicated protocol conversion, so it wasn't enough for the core message processing & routing to be solid and leak-free, all the input parsers and output converters had to be too.