3 ms·
There is a limited amount of current available from the electrical substations that serve any given area (and thus any given street), you can't just magic up en
by barnacled 6y ago
There is a limited amount of current available from the electrical substations that serve any given area (and thus any given street), you can't just magic up enough current to be able to charge vastly more electric cars, it requires massive infrastructural change.
All the existing street chargers I've seen (there's a couple up the road from me) are like 1 or 2 here + there. Probably no more than 1 per thousand parking spot (might even be being generous there).
You'd have to install these chargers (which appear to require a fair bit of work to install) at every single parking spot in the UK to make it practical. Which is not really practical even if we had the money to do it...
- kjksf 6y agoAnd yet we manage to build skyscrapers. Almost as if in the last 100 years we mastered the art of generating more electricity, laying out high voltage cables and constructing enough electrical substations to meet the demand, whatever that demand might be. See for example https://en.wikipedia.org/wiki/National_Grid_(Great_Britain)#/media/File:UK_Historical_Net_Electricity_supplied.PNG https://en.wikipedia.org/wiki/National_Grid_(Great_Britain)#...
- barnacled 6y agoThe problem is breadth not depth. In the case of a skyscraper that requires more power you then have only to upgrade a localised substation. In order for the entire country to consume considerably more _current_ that requires a global upgrade everywhere. There are 400,000 substations in the UK. I'm also not saying it's impossible, it's just something that the govt has to do first for this to even be feasible. It also makes the timeframe very impractical. The govt doesn't appear to ever address this or even begin the work required.
- throwaway69123 6y agoSurely funding these upgrades can be funded from the future booked revenue from the charging. I am sure the private sector would be chomping at the bit to capture a monopoly for these services as well.
- Ekaros 6y agoThis reminds me of the place near me. Essentially office building near at least two if not three factories. Had 2 charging stations expanded to 8 now there is new substation... So even in location where you would expect there to be capacity it was still required to install more...