3 ms·
Why Intel couldn't rent TMSC facility to produce their processors? Too proud?
by varispeed 6y ago
Why Intel couldn't rent TMSC facility to produce their processors? Too proud?
- wmf 6y agoTSMC's capacity for 2020-2021 is fully booked. Also, it would take Intel 1-2 years to redesign a processor for the TSMC process, but they thought their own 10nm was coming in less than a year so they never switched. And also pride.
- tpxl 6y agoThe designs are fab specific.
- colinmhayes 6y agoIn addition to the TSMC being booked and designs being fab specific using TSMC is a horrible sign for TSMC, basically showing investors that they've totally given up on their multi billion dollar investment. It would be a total admit of defeat.
- justinclift 6y ago> using TSMC is a horrible sign for TSMC Do you mean "is a horrible sign for Intel"?