The article mentioned that the battery was only able to supply 16MW to the grid. By all means a significant amount, but nowhere near the required 560MW needed t
by vegardx 6y ago
The article mentioned that the battery was only able to supply 16MW to the grid. By all means a significant amount, but nowhere near the required 560MW needed to stabilize the grid.
This is where hydro-based power plants excel, they're able to adjust the power output as quickly as gravity can push the water down the pipes. They're able to ramp up from almost no output to full capacity in minutes. Gas-turbines are also able to do this.
- pjc50 6y ago"Minutes" is not "140 miliseconds". But it's well worth reading https://www.ofgem.gov.uk/system/files/docs/2019/09/eso_technical_report_-_final.pdf https://www.ofgem.gov.uk/system/files/docs/2019/09/eso_techn... on an actual UK grid trip event to see what kind of things can happen; start at "summary of event" on p4. Note the three paragraphs starting with "However" as subsequent stability systems also failed. > This made the cumulative loss of generation 1,691MW (!) > All of the available “backup” power had already been deployed
- londons_explore 6y agoThat UK grid trip event was going to happen one day. The "Vector shift protection" and "Rate of Change of Frequency" in embedded generation (Home solar etc.) means that if it senses anything "funny", it'll shut off. Which in turn means if anything else goes wrong with the grid and there isn't enough generation, then all home solar countrywide cuts out, making the problem 10x worse. Lesson learned: "I detected something weird, lets turn off" is not a good algorithm for everyone to use on a system requiring high uptime! It was obvious from the start really...
- lambdatronics 6y agoReminds me of the flash crash -- "hey, the market's funny, we're all gonna pull out!"