Which is why if you want to build a box that holds 1000 dice, you need to take into account the +/- tolerances in your build process. At a guess, you'd probably
by ineedasername 6y ago
Which is why if you want to build a box that holds 1000 dice, you need to take into account the +/- tolerances in your build process. At a guess, you'd probably want to build at something like [dimensions] + 2*[tolerance]. So if your build process produced a 10cm cube with +/- 1mm, you'd want to build a 10.2mm cube so even a worse-case -1mm tolerance issue you'd still have +1mm of and so still be able to get the dice in without using force. And assuming the dice themselves didn't have some crazy high tolerance ranges.
I've got a side-gig/hobby making stuff, and the the 2x tolerance works pretty well as a rule of thumb for me, but the project type, material, and application probably play a big part in those considerations. Any industrial/mechanical/materials engineer care to weigh in?