4 ms·
I can confirm that I can make the three vane version myself from scratch in 3.5 hours. 90 minutes with pre-cut sheets. And is usually $20-30 all up including t
by Daniel_Connell 6y ago
I can confirm that I can make the three vane version myself from scratch in 3.5 hours.
90 minutes with pre-cut sheets.
And is usually $20-30 all up including the alternator.
The chain drive concept is indeed no longer what I'm using. It kinda worked, but not as well as I would have liked so now it's either a automotive alternator belt or direct drive to a Smartdrive unit or equivalent.