4 ms·
The solution is to connect them with HVDC, right? That might not be a great solution for making a single national-grid, but it would allow the 3 grids to mutua
by aidenn0 6y ago
The solution is to connect them with HVDC, right? That might not be a great solution for making a single national-grid, but it would allow the 3 grids to mutually borrow from each other, right?
- samcheng 6y agoIt's a lot of current, so maybe you want superconducting HVDC: https://en.wikipedia.org/wiki/Tres_Amigas_SuperStation https://en.wikipedia.org/wiki/Tres_Amigas_SuperStation
- msisk6 6y agoLast I heard the whole Tres Amigas SuperStation deal totally fell apart.
- msisk6 6y agoThat's exactly right, but the capacity is limited. ERCOT in Texas, for example, has 5 DC ties to the other grids: http://www.ercot.com/content/cdr/html/real_time_system_conditions.html http://www.ercot.com/content/cdr/html/real_time_system_condi...
- 7thaccount 6y agoMost of them are ageing too.
- dredmorbius 6y ago> Peter Fairley: So to give you a sense of just what the scale of the transfers is and how small it is, the East and the West interconnects have a total of about 950 gigawatts of power-generating capacity together. And they can share a little over one gigawatt of electricity. > Steven Cherry So barely one-tenth of one percent. From TFA.
- VBprogrammer 6y agoI wonder if this has more to do with "Black Start" planning than actually providing power cross grids. https://en.wikipedia.org/wiki/Black_start https://en.wikipedia.org/wiki/Black_start
- dredmorbius 6y agoInteresting suggestion, though AFAIK that typically relies on auxiliary onsite power source at some generating plants, as noted in the Wikipedia article intro? Anything you can find to support grid interconnects as black-start capacity?
- VBprogrammer 6y agoPurely speculation based on the small capacity compared to total generated capacity. From what I understand there can be a number of different techniques for black starting a grid, including pumped storage / hydro generation because they can be started with very modest power. Being able to jumpstart a grid based off of a neighbouring grid seems to make sense.
- jdswain 6y agoWouldn't a better solution be to make them all in phase with each other? Then there wouldn't need to be any HVDC interconnect.
- tinix 6y agoConsider the distance, and speed of light, and the speed of electricity (1/100th of that). I don't think it's truly feasible to keep that much physical space in sync. Hmm...
- Gwypaas 6y agoApparently not a problem to do today. https://en.m.wikipedia.org/wiki/Synchronous_grid_of_Continental_Europe https://en.m.wikipedia.org/wiki/Synchronous_grid_of_Continen...
- phonethrowaway 6y agoThat's not a very large area, to be fair. That's about the size of half of the United States, in distance/spread. Europe isn't a continent in the traditional sense, it's a region, and not a huge one. This might counter the grandparent poster if Asia was on the same synchronous grid, but it's not.
- Gwypaas 6y agoI guess there's two ways of looking at it. The distances spanned by the extreme points net or how dense it is. Not that I have the knowledge to relate any of that to real world use cases or consequences. Here's the map including all larger powerlines https://www.entsoe.eu/data/map/ https://www.entsoe.eu/data/map/
- phonethrowaway 6y agoThis is a better example IMO: https://en.wikipedia.org/wiki/IPS/UPS https://en.wikipedia.org/wiki/IPS/UPS It spans 8 timezones. Europe is just larger in capacity, not breadth.
- taneq 6y agoPretty much. I mean, that's basically what a VSD is: A 3-phase rectifier back to back with a 3-phase inverter. Then you can have the two sides at different voltages and phases and transfer power back and forth at will.