2 ms·
Check out the 4 key metrics from Accelerate - deployment frequency, lead time, change rate failure and mean time to recovery. This is good for teams. IMHO, trac
by bcosynot 6y ago
Check out the 4 key metrics from Accelerate - deployment frequency, lead time, change rate failure and mean time to recovery. This is good for teams. IMHO, tracking productivity for individuals is irrelevant.
- Jefro118 6y agoThis looks good, do you use any tools to keep track of these?
- bcosynot 6y agoI don't think anything exists out of the box unfortunately. You should be able to start tracking them manually as a starting point. Do read the book (Accelerate by Dr Nicole Forsgren) for more information about why these are important.