3 ms·
I worked for NBCU and used to manage 3.3 3.54, 3.23, and about 5 other 3.x /16s. We had some design policies created by an elderly architect that was a bit laz
by floatinglotus 6y ago
I worked for NBCU and used to manage 3.3 3.54, 3.23, and about 5 other 3.x /16s. We had some design policies created by an elderly architect that was a bit lazy, so instead of VLSM for point to point links we would use /24s. Ahhh, the good old days.
- tptacek 6y agoThis is what I think about when I'm told I should use /64s for point-to-point links in v6.
- tfayd 6y agoSome say that he is still doing that today.
- oldmancolin 6y agoWell GE does bring good things to life