3 ms·
For existing roads, you will not be reconstructing them from scratch. Instead, you will be repaving them, leaving subgrade as is. This brings a cost down order
by xyzzyz 6y ago
For existing roads, you will not be reconstructing them from scratch. Instead, you will be repaving them, leaving subgrade as is. This brings a cost down order of magnitude below what Strong Towns claims.