If I read this [1] correctly, the fund covers only technical decommissioning work, "liability resulting from spent-fuel management (e.g., costs for on-site inte
by phreeza 6y ago
If I read this [1] correctly, the fund covers only technical decommissioning work, "liability resulting from
spent-fuel management (e.g., costs for on-site interim storage) and all costs related to final nuclear waste disposal is not covered by these estimates".
Even only the decommissioning fund requires a payment of 5 cents/kWh, which just itself is a cost that solar can compete with.
[1] https://epub.wupperinst.org/frontdoor/deliver/index/docId/2608/file/2608_EUDecommFunds_CZ.pdf https://epub.wupperinst.org/frontdoor/deliver/index/docId/26...