Exactly, any sane structure is built with some redundancy so you should be able to temporarily remove a column or piece of wall to install the jacking equipment
by m4rtink 6y ago
Exactly, any sane structure is built with some redundancy so you should be able to temporarily remove a column or piece of wall to install the jacking equipment and then do the job.
For the tokyo station building, they simply lifted the building a bit and then placed it on seismic isolators. Can be seen on page 14 of this: https://www.ejrcf.or.jp/jrtr/jrtr61/pdf/6-15_web.pdf https://www.ejrcf.or.jp/jrtr/jrtr61/pdf/6-15_web.pdf
Or for the Kansai International Airport the huge terminal building was built on jacks from the start the artificial island it was build on settles at an unequal rate:
http://www.kansai-airports.co.jp/en/efforts/our-tech/kix/sink/hudou.html http://www.kansai-airports.co.jp/en/efforts/our-tech/kix/sin...
They measure the different parts settling and then have a bunch of guys that will go to the affected section and jack the columns appropriately.