9 ms·
Absolute nonsense. Owners of nuclear plants are far more likely to open suits, and the suits against plants are over quickly and very rarely successful: https:
by hwillis 6y ago
Absolute nonsense. Owners of nuclear plants are far more likely to open suits, and the suits against plants are over quickly and very rarely successful: https://www.nrc.gov/docs/ML1901/ML19010A148.pdf https://www.nrc.gov/docs/ML1901/ML19010A148.pdf
Take SCANA as an example. They apply to the NRC in March 2008, are granted a price increase three days later, and are granted project approval 5 months after that. 4 months after that the construction plan is approved. 10 months from filing to green light, with first construction in 3 years and completion in 10 years. Projected cost is 9.8 billion for two AP1000 units- $5.4 million per MW capacity (inflation adjusted). Far more expensive than gas or renewable energy: https://www.eia.gov/outlooks/aeo/assumptions/pdf/table_8.2.pdf https://www.eia.gov/outlooks/aeo/assumptions/pdf/table_8.2.p...
Before even starting, they need to redesign. NRC approves. First new US reactor in 30 years. Construction begins in 2013. In 2014, they suddenly need an extra year and 1.2 billion more. By 2016 they have hiked rates NINE times. In 2017 Westinghouse goes bankrupt trying to build these reactors. Estimates put the total cost to finish at 23 BILLION USD. The parent company votes to abandon the project.
https://www.chooseenergy.com/news/article/failed-v-c-summer-nuclear-project-timeline/ https://www.chooseenergy.com/news/article/failed-v-c-summer-...
That has absolutely nothing to do with lawsuits or policy. The legislature gave them absolutely everything they wanted, and they had a wide open door to build reactors. They couldn't do it. It's a simple as that.
- throwaway0a5e 6y ago>and the suits against plants are over quickly and very rarely successful Because the court system is well practiced at identifying and dismissing suits that are brought for no other reason than to delay and obstruct something.