4 ms·
FTA Each unit can be configured to produce between 1 and 20MW peak power, with output duration from 15 minutes to 8 hours. For reference, 20MW is ~4 large aer
by bassman9000 6y ago
FTA
Each unit can be configured to produce between 1 and 20MW peak power, with output duration from 15 minutes to 8 hours.
For reference, 20MW is ~4 large aerogenerators. A single nuclear PWR is 500-1000MW.
It can scale up to provide 1 GW of storage - enough to balance the load of an entire large city.
You'd need 50 of these installations for a single city, for 15 minutes of power, 1000 for the 8 hours.