3 ms·
I've done about 10 design projects and handing the PSD was (a) specified in the deal from the outset, and (b) I don't think there would have been a problem gett
by ScottWhigham 18y ago
I've done about 10 design projects and handing the PSD was (a) specified in the deal from the outset, and (b) I don't think there would have been a problem getting the PSD even if it wasn't in the "contract". Maybe "You can't have the PSD" is standard for big firms but it hasn't been the norm for small, 1-2 time projects that I've done.