Would you use an 'agile' methodology to build a rocket at all? There some projects not suitable for an agile approach, especially if we're talking "projects" ge
by jrochkind1 6y ago
Would you use an 'agile' methodology to build a rocket at all? There some projects not suitable for an agile approach, especially if we're talking "projects" generally beyond software engineering, perhaps MOST aren't. "Agile" is software engineering advice. OP is advance for projects that an agile approach is suitable for. Ie, not building a rocket.
- jordache 6y agomany real world complex software is also not suitable for dogmatic application of agile/lean principles
- Jtsummers 6y agoAgile isn't, strictly, about software though it certainly is the predominant application. So first, let's separate two things: - building - designing Some parts of agile do apply to building. See Lean Manufacturing, parts of it are responses to maintain quality (Andons used to stop production) and parts are to change over the manufacturing floor to build something else (same plant can make many kinds of cars without a fixed production line for each, letting them meet demand). Other parts of agile, though, are aimed more at the design portion. Sprints, for instance, are meant to give you short iterations that let you frequently evaluate both your process and your product's success/failure. You can apply agile concepts to developing almost any kind of thing. Actual rocket scientists create simulations, scale models, full-scale models, prototypes and other things on their way to the final system. So they're already applying the same iterative approach that most agile proponents endorse. The question is, is the iteration deliberate or accidental? Or do they try to deny the iterations even exist? Once they get to building the rocket, that might be less agile depending on circumstances (is it the first one they've built? are they setting up a production line? is it a one off?).
- bluGill 6y agoNote that when building cars flexibility is a trade off. You can switch car type, but the jigs for the car you are not currently making is still a cost, separate lines at near full capacity are a better use of resources. Only if you can forcast demand years in advance to build the factory to the right size. This is a hard problem. Note that flexible factories have other limits. Honda can't make a large truck in their factory as there isn't room. I don't know if Honda regrets this cost or not.
- Jtsummers 6y agoI always come back to this: > Fisher's Fundamental Theorem: The better adapted a system is to a particular environment, the less adaptable it is to new environments. -- Gerald Weinberg,"The Psychology of Computer Programming" There are always trade offs. The more flexible you make a system, the less efficient it is (most likely) in achieving its (now increased) goals. But the more efficient you make it, the harder it is to adapt it to fit additional or changed goals. Which trade offs you accept depend on your objectives, and sometimes your ability to spin up a whole new factory.
- dllthomas 6y agoWe can probably force this to be true, to some degree, by defining "adapted" differentially... but otherwise this smells more like a "possibility frontier" situation than a strict spectrum.
- jrochkind1 6y agoI think it's useful to separate building and designing like that. What it makes me think of is: One thing fairly unusual (if not unique) about software is that the designing and the building generally happen "simultaneously", or in tandem, or in very tight iterations. We design software as we build it, and we build it as we design it. At least often/commonly. If we don't always do that with software, I think we always do it at least to some extent (in an unusual way compared to physical things), and software is (often if not always suitable to designing and building. I think "agile" as we know it (which is really short for "agile software development", that's what the agile manifesto hasin it's title!) is particular to something you are (or can profitably) design as you build. While there are analagous things in physical products, and there is (or profitably can be) some element of design/build cycle in physical products, I think rarely to the extent it can and does happen when making software. Rockets are probably at the far end of separating design and build. But the tldr version is probably just: The Agile Manifesto's full name is literally "Manifesto for Agile Software Development". While some of the things may happen to be useful or applicable in other fields of endeavor, others may not be. Saying that something from the Manifesto for Agile Software Development and ensuing methodology doesn't apply to a rocket is not a relevant critique of the methodology as applied to software, as intended.
- Jtsummers 6y ago> One thing fairly unusual (if not unique) about software is that the designing and the building generally happen "simultaneously", or in tandem, or in very tight iterations. We design software as we build it, and we build it as we design it. I actually had something about that but cut it for some reason. I'd like to point out that while the manifesto is about software, a lot of the ideas (beyond the manifesto itself and influencing the manifesto) come from other disciplines. Mary and Tom Poppendieck, for example, are major proponents of Lean Software Development, whose ideas are a translation from the world of physical manufacturing. Many of the DevOps ideas (not necessarily how it's played out) come from Eli Goldratt and his Theory of Constraints. An interesting thing about both Lean and ToC is that neither is terribly prescriptive. They're actually generalized concepts that can apply to almost any kind of system and (mostly) lack prescriptive text saying, "Thou shalt do...". Compare that to much of the Big-A Agile movement which is inflexible, ironically, and often very prescriptive. Perhaps not down to the specific tool that should be used, but often to the specific methods that should be used (Scrum: Thou shalt have 1-4 weeks Sprints; Thou shalt have time boxed meetings of this nature; SAFe: Thou shalt have a massive meeting every 6 months in the format we describe in this chapter). Ok, that's a bit unfair to Scrum, it's actually more flexible than that. But I'll happily burn my books on SAFe (picked up for a previous job). Many of the other ideas for Agile are born out of Systems Engineering which had already dealt with Waterfall. You had the V model (an improvement, but still many of the flaws if taken too literally, over Waterfall) which makes V&V run concurrent to design and development and encourages feedback loops. In many ways this is akin to TDD. Incremental and iterative development processes, which are fundamentally no different from Scrum except Scrum pushes you to much shorter times and has a stricter structure. Evolutionary development which is really close to what many, if not most, agile proponents endorse (MVP, then add on features and modify the base as needed). None of that came from software (specifically), it came from developing physical and (in their parlance) cyber-physical systems.
- bluGill 6y agoI would use ideas from agile to build a rocket. Automative testing, keeping everything green. Just because there are millions of lines of code left to write before the rocket can take the first test fire doesn't mean I'm not keeping the code in shape that the current features could ship. But my rocket needs to be ready when the earth-venus system is in the right stage or I delay a few years. Agile cannot handle this. Agile can handle getting rid of some features to meet the deadline, but waterfall can do priorities as well. What is needed is watching the end date and assurance that you will make it, or warning to add people before the cost of adding people is greater than their future contributions.
- Jtsummers 6y agoI feel like I write about Waterfall and its problems a lot on this forum, but I'm going to do it again: > Agile can handle getting rid of some features to meet the deadline, but waterfall can do priorities as well. Waterfall is not particularly good at handling priorities. It's actually worse, in my experience, than anything else. Waterfall is about the order of doing things (it is fundamentally linear), committing to a plan (lack of flexibility), and has minimal feedback loops (lack of responsiveness). If you have a 2 year deadline (true deadline like in your example), Waterfall only helps you if you assume everything will go right or put in drop dead dates for lower priority things. But even then, you'll have wasted so much time in your planning and designing you probably won't be able to keep it on track within a reasonable budget extension. What you really want to handle priorities is an incremental and iterative development model. You know your target, but you break it down into smaller increments and build it out over time. After each iteration you re-evaluate your ability to hit the target. Within each iteration you may use a Waterfall-styled approach (particularly if it's a portion that's well understood in your organization or sufficiently small) or you may extend the iterative approach by adopting an Agile approach (think 3-6 months of 1-2 week sprints). Using your Earth-Venus example. You need X, Y, Z. You want A, B, C. You only have 2 years to deliver. In Waterfall you'd spend 3-6 months designing everything before building it. If you're smart you design it with a way to drop A, B, and C. But that's a lot of time spent up front on contingency planning and pushes you closer to 6 months. Now you're 18 months from the deadline before production even starts. Oh, and testing doesn't happen until pretty late in this process. So your production is constrained to no more than 12 months in order to allow sufficient testing time (6 months). If you're actually smart, you create checkpoints/milestones and do it incrementally. You start work on X, Y, Z and as much of A, B, C as you can afford. After 3 months you see that X is progressing fine, Y is possibly going to miss the target, and Z is definitely going to. So you check and A is going to be done in a month, B turned out to be a cluster, and C may complete on time. Cut your losses, B is gone, the money and manpower are moved to the core mission. Next iteration you reexamine, and find out that you C may still complete but Z is barely back on track. So you take some or all the funding and people from C and dedicate them to getting Z back on track. In the best case C can still be done, but it probably won't. We accept our losses and continue this process. That is a fundamentally agile approach. It's about responding to the changes that come up. Waterfall is not, in itself, capable of this.
- cuddlybacon 6y agoJ. J. Sutherland claims that Saab designs fighter jets using scrum. He claims not only have they been successful from a cost perspective, they also have an easier time staying up to date in the arms race. Pun intended. He also sites case examples of restaurants and house remodellers using scrum successfully.