If you are talking about the FIU pedestrian bridge, that was not a situation of slow building. That project was to be a showpiece in FIU accelerated bridge con
by themaninthedark 6y ago
If you are talking about the FIU pedestrian bridge, that was not a situation of slow building.
That project was to be a showpiece in FIU accelerated bridge construction (https://www.chronicle.com/article/engineer-connects-his-research-with-campus-bridge-project/ https://www.chronicle.com/article/engineer-connects-his-rese...).
I have not kept up with all the analysis(https://www.eng-tips.com/viewthread.cfm?qid=459940 https://www.eng-tips.com/viewthread.cfm?qid=459940) but IIRC the combination of the accelerated construction, the new concrete truss design as well as organizational changes that left key position unfilled were the major design factors.
There were also clear warning signs of the impending collapse that were ignored.
EDIT: I mistakenly named the wrong university FSU -> FIU