2 ms·
Not to say batteries aren’t crucial, but you are comparing apples and oranges. That battery is only used for a very small peak / corner case and at least when
by gumby 6y ago
Not to say batteries aren’t crucial, but you are comparing apples and oranges.
That battery is only used for a very small peak / corner case and at least when I looked at the numbers last year hadn’t yet paid for its cost, despite some breathless claims. I do expect it to pay off though.
The entire demand for a battery like that for a country like Australia is probably one unit. And it’s no accident that it was installed in south Australia, not one of the more densely settled states.
It was a good PR stunt, but doesn’t really teach anything special.
- ggm 6y agoIt's been a lot more than a PR stunt, it's alerted the community to severe market distorting pricing practices and saved the state millions. It's already running in profit on the part which is not contracted to prevent bidding wars and it's being extended physically. It did have a huge PR element in its deployment but it's real, and it does a real job. It's role in frequency stabilisation stopped potential blackouts when long lines to NSW and Victoria died. (Islanding SA and potentially causing rolling blackouts from frequency instability)
- nmfisher 6y ago> And it’s no accident that it was installed in south Australia, not one of the more densely settled states. It was installed in South Australia because the whole state suffered a blackout in 2016 from an overloaded transmission network. https://en.wikipedia.org/wiki/2016_South_Australian_blackout https://en.wikipedia.org/wiki/2016_South_Australian_blackout The other Australian states didn't have the pressing need, but I don't see why it wouldn't be equally feasible.
- nl 6y ago> when I looked at the numbers last year hadn’t yet paid for its cost, despite some breathless claims. Well.. of course? 2 years payoff would seem unbelievably fast for any infrastructure project. It did save $40M last year alone though (the project cost $86M). > The entire demand for a battery like that for a country like Australia is probably one unit. And it’s no accident that it was installed in south Australia, not one of the more densely settled states. Err.. no. There are around 40 proposed or signed projects in Australia larger than that battery. Here is a signed one being built now with a 400 MWh battery: https://www.pv-magazine.com/2020/06/26/australia-approves-720-mw-solar-farm-coupled-with-massive-battery/ https://www.pv-magazine.com/2020/06/26/australia-approves-72... The Lake Bonney 50MWh battery has been around for nearly 2 years now: https://www.infigenenergy.com/our-assets/firming-assets/ https://www.infigenenergy.com/our-assets/firming-assets/ Approved 600MWh project in Geelong: https://www.pv-magazine.com/2020/04/07/australia-to-host-600-mw-battery/ https://www.pv-magazine.com/2020/04/07/australia-to-host-600... Another 14 projects here in NSW alone (many of which are pumped hydro or compressed air or other interesting forms of storage): https://reneweconomy.com.au/fourteen-new-big-battery-storage-projects-proposed-for-nsw-37202/ https://reneweconomy.com.au/fourteen-new-big-battery-storage...