3 ms·
As has been pointed out in many posts to this thread, long before your post, there are still capabilities ULA offers that SpaceX doesn’t. That includes vertical
by simonh 6y ago
As has been pointed out in many posts to this thread, long before your post, there are still capabilities ULA offers that SpaceX doesn’t. That includes vertical integration, which SpaceX will develop but currently doesn’t have, and various fairing and launch site options. SpaceX has yet to achieve direct to GTO, and ULA have a better record of accurate insertion into the desired trajectory, that can be a big deal. ULA also has launch site options SpaceX doesn’t have, specifically while F9 can launch from Vandenburg, Heavy cant yet and the time and cost fir that might nit make economic sense
Finally there are some mission profiles even Falcon Heavy isn’t ideal for due to its RP1 fuelled upper stage. There are some missions where the extra Specific Impulse from a Hydrologist upper stage makes a difference.
So yes in the longer term many of these issues might be resolvable, but not all and this contract is for specific envisioned missions on a schedule and with known requirements, so nobody is making up numbers here. If it’s 60/40 there will be reasons for that.
- jeffrallen 6y agoI'm not interested in the long term. I want my tax-paying parents to get a fair deal now. Government should work for the people, not for ULA.