33 ms·
The actual work of installing is a day labor. The pre work to get the paperwork in place so you are allowed to install it can be over a year. I don't approve o
by bluGill 6y ago
The actual work of installing is a day labor. The pre work to get the paperwork in place so you are allowed to install it can be over a year.
I don't approve of the above, but that is how it is.
- CyberDildonics 6y agoI don't think cutting a small hole in between studs requires "architectural design" and "electric load calculations" really means "it uses this many watts". There is nothing typical about someone needing a year to do something relatively simple. Most restrictions probably just say that the condenser coils can't be on the side that faces a street and maybe that it has to be on a dedicated circuit.
- bluGill 6y agoYou would think, but California is a weird world where often it does take that long.
- CyberDildonics 6y agoBoth of your comments are basically saying 'this is true' and saying 'this is true' again. Do you have any sources or even reasons why installing a split unit air conditioner in all of california 'often' takes a year?