2 ms·
The plant is built like that so spent fuel can be lifted out of the reactor and placed directly in the pool using one crane. A more secure spent-fuel pool would
by gamble 16y ago
The plant is built like that so spent fuel can be lifted out of the reactor and placed directly in the pool using one crane. A more secure spent-fuel pool would have required more elaborate fuel handling, thus a more expensive design.
Also, when these plants were built I don't think they anticipated the spent-fuel pools would become long-term storage. There was the assumption that centralized nuclear waste disposal sites would be built and the pools would only store waste until it was safe to transfer.
- jorangreef 16y agoThis is often the case, a plan for the removal of waste to a disposal site is promised, and then once the plant is built, and the contractors have been paid, nothing happens. New plants are then built, it is said that a disposal plan will be put into effect, and still these plans never materialize.