3 ms·
The article refers to orders of 50000 or 100000 CPUs as so large that AMD might have trouble fulfilling them. Is it plausible? How long does it take to manufact
by HelloNurse 6y ago
The article refers to orders of 50000 or 100000 CPUs as so large that AMD might have trouble fulfilling them. Is it plausible? How long does it take to manufacture them? That is, how many wafers per day can TSMC and/or Global Foundries process with a plausible portion of their capacity?
- jmole 6y agoThe demand is already booked at the fabs. This is an extra 50-100k on top of that. Each chiplet (core complex die) on the AMD Epyc is 74 mm² plus the I/O die, which is built on a 12nm process is 125 mm². [0] There is roughly 70k mm² of area on a 300mm wafer. Let's say for math's sake that after yield loss and so on, we end up with 37k mm^2 of chips that work; That's 500 chiplets per wafer. Each CPU has 8 chiplets, so that's 62 CPUs per wafer. So 50k CPUs is ~800 wafers and 100k CPUs is ~1600 wafers. Cycle times for 7nm are ~80 days [1] So you have at least an 80 day lead time, plus whatever time is spent waiting for open capacity. TSMC capacity is said to be 130k wafers/month @ 7nm [2], so the volume needed is only ~1% of total monthly fab allocation. According to the same source, AMD already has ~20% allocation at TSMC, so it's 5% of AMDs total production for a single month for that order. [0] - https://en.wikichip.org/wiki/amd/microarchitectures/zen_2#Core_Complex_Die https://en.wikichip.org/wiki/amd/microarchitectures/zen_2#Co... [1] - https://semiengineering.com/battling-fab-cycle-times/ https://semiengineering.com/battling-fab-cycle-times/ [2] - https://wccftech.com/amd-7nm-wafer-production-set-to-double-in-2h-2020-7nm-capacity-at-tsmc-currently-fully-booked/ https://wccftech.com/amd-7nm-wafer-production-set-to-double-...