3 ms·
ITER won't be commercially viable. After ITER comes DEMO, which is itself a decades-long project. DEMO won't demonstrate electricity generation until 2048: http
by throwawaysea 6y ago
ITER won't be commercially viable. After ITER comes DEMO, which is itself a decades-long project. DEMO won't demonstrate electricity generation until 2048: https://en.wikipedia.org/wiki/DEMOnstration_Power_Station#Timeline https://en.wikipedia.org/wiki/DEMOnstration_Power_Station#Ti...
In my mind, that means we need to see deployment of Gen 4 fission reactors (https://en.wikipedia.org/wiki/Generation_IV_reactor https://en.wikipedia.org/wiki/Generation_IV_reactor) commercially, to bridge the gaps between a decline in coal-fired plants and the potential of renewables.
- VyperCard 6y agoThey take too long to build
- pfdietz 6y agoThere probably has to be a machine before DEMO to solidify the engineering and materials. Also, after ITER, there will not be enough tritium to do another large machine (the tritium comes from heavy water reactors, but those have lost in the market and will be shutting down in the next couple of decades.) So a machine to just make tritium may be needed.