3 ms·
Vancouver BC has had a fully automated train system since 1986. When it started they were using VAX as part of the control system.
by walrus01 6y ago
Vancouver BC has had a fully automated train system since 1986. When it started they were using VAX as part of the control system.
- xattt 6y agoToronto had the demonstrator line that saw and continues to see revenue service despite its ancient age. Toronto’s cars were built with a full cab, partly because of pressure from the union, to allow an operator to push the button to close the doors. (1) The system no longer runs in ATO (automatic train operation) because of ongoing issues around maintaining contact with the mainframe when it snowed. (1) https://transittoronto.ca/subway/5107.shtml https://transittoronto.ca/subway/5107.shtml