Fair enough. Still, it's one thing to be specced for 24kW peak load (the breaker) and quite another to require 20kW continuous (two 10kW nuclear power plants).
by dTal 6y ago
Fair enough. Still, it's one thing to be specced for 24kW peak load (the breaker) and quite another to require 20kW continuous (two 10kW nuclear power plants). I still think 20kW is an awfully huge amount of power - the average US house only uses about 1 kilowatt when you smooth it out.