2 ms·
"Making of" landing gear: https://www.youtube.com/watch?v=77oRSCxGmYA https://www.youtube.com/watch?v=77oRSCxGmYA "Gear Stats: •3 months' work between design
by acqq 6y ago
"Making of" landing gear:
https://www.youtube.com/watch?v=77oRSCxGmYA https://www.youtube.com/watch?v=77oRSCxGmYA
"Gear Stats:
•3 months' work between design and build (early June - early
September). About a month per side.
•Over 200 hours of work total (design+build).
•Over 1,000 parts per side (not including the wheels), for a
total well over 2,000.
Video Stats:
•Over 600GB of raw footage/130 hours.
•Editing took 2 weeks.
•Video was sped up 100-200x.
•Produced in Final Cut and Motion."