4 ms·
I think the obsession with tickets /Jira as the be all and end all of SCRUM is the main problem. What is lacking in a lot of cases is an overall vison and plan
by C1sc0cat 6y ago
I think the obsession with tickets /Jira as the be all and end all of SCRUM is the main problem.
What is lacking in a lot of cases is an overall vison and plan for the desired end state -
I have seen doing a classic waterfall design stage with a RAD/AGILE/DSDM/SCRUM development stage right at the end work well.