3 ms·
I once had a patio installed. It was to be elliptically shaped, and the charge was per square foot. The contractor staked it out, and ordered the materials. It
by WalterBright 7y ago
I once had a patio installed. It was to be elliptically shaped, and the charge was per square foot. The contractor staked it out, and ordered the materials.
It didn't look quite right. I finally measured the major and minor axis, and computed the area. Turns out it was 30% smaller than the square footage quoted. The bricks were stacked up, and a little math gave me the square footage of the bricks. It was also 30% less than the quoted square footage.
I brought it up with the contractor that the size seemed less than the quoted size. He said he'd made a mistake staking it out. Obviously, he had not, else he'd have had too many bricks.
He did a good job anyway, and I paid him 30% less than the quoted amount.
I suspect he had realized long ago that his customers were math challenged, and weren't noticing his oversized quotes. So he kept increasing the gap until it got to a ridiculous 30% overage.
My advice to people who feel that math is a pointless imposition on your time, you're going to pay for not learning it. And you'll never realize you're being rooked.
- nickysielicki 7y ago> My advice to people who feel that math is a pointless imposition on your time, you're going to pay for not learning it. And you'll never realize you're being rooked. I really hope that's not what you took away from my comment.
- WalterBright 7y agoIt's more of a general comment to people who justify cheating, complain about math requirements, and/or look for ways to avoid dealing with math. It's relevant to why learn the mechanics when a computer can do it for you.