3 ms·
part of me is curious if this is a way to appease the administration due to high pressure [0] and wait out the next election cycle. They are talking about 2021-
by salimmadjd 6y ago
part of me is curious if this is a way to appease the administration due to high pressure [0] and wait out the next election cycle. They are talking about 2021-2029.
Even if Trump is reelected, I could see them leasing an existing fab and have a ribbon cutting ceremony for Trump to get his photo-op and then just weigh their options with minimal additional expenditure (they've already commented on opening a fab in US won't be economical [1]) with the thinking that a few $million spent on a lease and avoiding antagonizing Trump might all be worthwhile in any kind of tariffs on their business.
[0] http://archive.is/XYzCd http://archive.is/XYzCd
[1] https://asia.nikkei.com/Business/Technology/TSMC-weighs-new-US-plant-to-respond-to-Trump-pressure https://asia.nikkei.com/Business/Technology/TSMC-weighs-new-...
edited my post by adding these articles as well as editing the text to better reference the links
- selimthegrim 6y agoThe thing is WI is already mad at Foxconn for doing that. AZ is even more of swing state so I don't know if same trick will work twice
- sanxiyn 6y agoTSMC found it won't be economical unless subsidized. My understanding is that TSMC managed to get commitment to subsidy from US federal government and the State of Arizona.