3 ms·
Its a stretch of the original meaning, but a good one I think. Building a product before a good indication it is the right thing to build is prematurely optimi
by Nevermark 7y ago
Its a stretch of the original meaning, but a good one I think.
Building a product before a good indication it is the right thing to build is prematurely optimizing a business.
At any level of a project, it is important to do things in the right order, to avoid wasting unrecoverable time and effort on work that never needed to be done.