3 ms·
> If you didn't want this level of analysis, why the hell would you take a $150/hr engineer and have him screwing in shelves rather than call in the $12/hr main
by Muzza 16y ago
> If you didn't want this level of analysis, why the hell would you take a $150/hr engineer and have him screwing in shelves rather than call in the $12/hr maintenance man?
At the time of the incident with the screws, the guy was an intern...