Yeah, periodic $400K maintenance on a sewage system serving 4,000 people actually sounds kind of reasonable and is one of the least troublesome things in the G
by jonas21 7y ago
Yeah, periodic $400K maintenance on a sewage system serving 4,000 people actually sounds kind of reasonable and is one of the least troublesome things in the GAO report [1].
I'm a lot more concerned about things like this:
> In an effort to improve sustainment of the LPD 17 class ships, the Navy decided to install titanium piping to carry seawater for firefighting and to cool machinery instead of copper-nickel piping because of its lighter
weight and increased durability. However, instead of saving effort in sustainment, these pipes required more maintenance effort than planned and, in many cases, eventually had to be replaced. Early in the acquisition process, the Navy studied this decision and discovered that unlike copper-nickel piping, titanium piping carrying seawater is susceptible to “biofouling” — meaning sea life such as shellfish grow inside
the pipes. To prevent biofouling, Navy engineers determined that a chlorination
system — which adds chlorine to seawater entering the ship in order to kill
biological material in the water — and a dechlorination system — which
removes the chlorine before the seawater is dumped from the ship — would be needed and included specifications for the shipbuilder to install
these systems. Then, according to shipbuilding program officials, after the
ship was on contract, the shipbuilder reported to the Navy that it could not find suitable chlorination and dechlorination systems. The program office
decided to proceed with ship construction absent these systems and
evaluate the extent of the biofouling problem after ship delivery ... Biofouling degraded the functionality of a number of other
systems on the ship that depend on the water delivered by the piping
system, resulting in overheating of main and ship service engines and
loss of electric power generation, among other problems. To address
these and related issues across the LPD 17 class, the Navy’s fleet spent
at least $250 million to: (1) buy and install new copper-nickel piping that is
now costlier, heavier, and not as durable as titanium; (2) install
chlorination systems that were later found to be unreliable, requiring
significant maintenance; and (3) conduct unplanned maintenance and
replace systems that broke due to shellfish contamination, among other
interventions.
Or this:
> The Navy used a new design for CVN 77’s stores elevators, which are
used to move provisions between decks. However, among other
issues, the elevators are too small to fit a standard sized pallet jack.
Thus, provisions cannot be loaded or unloaded with a pallet jack or a
forklift and must be manually unpacked and stacked by hand on to the
elevator. Unloading is further complicated, according to the ship’s
crew, because the elevator doors are so small that the average sailor
cannot stand up as they enter and exit the elevator.
[1] https://www.gao.gov/assets/710/705463.pdf https://www.gao.gov/assets/710/705463.pdf
- astronautjones 7y agoand for what. "how will you pay for it" x10000. maldito país, this country is a joke