2 ms·
It looks like that the 960 number is predicated upon a start time from "idle", and minimal interactions. The actual slope rate of test completion looks like it
by mlyle 7y ago
It looks like that the 960 number is predicated upon a start time from "idle", and minimal interactions. The actual slope rate of test completion looks like it's 192/hour. If that throughput can be maintained with more frequent interaction to keep the machine fed, it'd be 4.6k/day.
https://www.dialog.roche.com/content/dam/dialog/owp/apac/Media/Molecular/cobas-8800-performance.png https://www.dialog.roche.com/content/dam/dialog/owp/apac/Med...
That is, it takes time to "stuff the pipeline".
The cited number -- 4128 -- appears to be 21.5 * 192.