The pace of innovation here is absolutely ludicrous. They designed and built a custom welding machine _and_ a custom x-ray machine for building tank domes in fo
by Ajedi32 7y ago
The pace of innovation here is absolutely ludicrous. They designed and built a custom welding machine _and_ a custom x-ray machine for building tank domes in four weeks? They've gone from a production rate of one prototype in 8 months to one prototype every 2 weeks in less than a year. They doubled the size of their workforce in less than 48 hours. I'm gonna have to agree with the article author here: this is absolutely mad.
- aguyfromnb 7y ago>They designed and built a custom welding machine _and_ a custom X-Ray machine for building tank domes in four weeks? Can any engineer speak to whether this is actually progress, or even necessary? It seems like every time something goes wrong, Elon "invents" a way to do it better. I'm old enough to remember rescue subs, battery swaps, brain implants that will cure autism, factories spitting out factories, solar shingles, truck carriers, one-hour body shop service, tunnels at a fraction of the cost, the ability to identify squeaks in your car with your phone, robots assembling cars so fast they need a strobe light to be seen...
- peeters 7y agoI'm not in that area, but I struggle to find an analogue of a large pressurized tank on Earth where mass is the dominant cost factor. You might have equally big tanks on Earth, under equal pressures, but it will be more cost-effective to just increase the material used on the shell of the tank to solve your problems. Whereas in space, every kg that can theoretically be removed from the launch vehicle is worth investing in, even if it raises the cost of engineering and materials. So yes it seems reasonable to me that these are groundbreaking challenges.
- aguyfromnb 7y ago>So yes it seems reasonable to me that these are groundbreaking challenges. Isn't weld strength something engineers would know/understand in advance, though? How would it come as a surprise that the welds would fail under pressure? It seems strange to me that Musk could be spending so much time working on Starship, and somehow a "badly designed, badly built, and badly checked" rocket makes it to the platform and explodes.
- 101404 7y agoThey are currently not primarily working on the rocket, but in the production process.
- zchrykng 7y agoWelding by hand is both an art and a science. There is going to be variability in the quality of the weld, which will introduce variability into the strength. Machines can be far more precise and consistent compared to humans. They probably designed their tolerances assuming perfect welds and then didn't have them.
- aguyfromnb 7y ago>They probably designed their tolerances assuming perfect welds and then didn't have them. This sounds like terrible engineering practice.
- irrational 7y agoNecessity is the mother of invention?
- varjag 7y agoIt's perfectly normal engineering practice. Camshaft, gearbox profiles, and bearing surfaces in your car have very tight tolerances. A one slightly unbalanced turbine blade in your airliner engine would assure catastrophic failure. etc etc
- Bendingo 7y agoYes, but these items (camshaft, gearbox etc) are not made "by hand".
- varjag 7y agoCamshafts were turned then ground manually on line lathes and surface grinders for many decades before advent of CNC, with about the same degree of dimensional precision as today. It is more an issue of quality control and inspection routines.
- m4rtink 7y ago>I'm not in that area, but I struggle to find an analogue of a large pressurized tank on Earth where mass is the dominant cost factor. If you stretch the definition of "tank" and "on Earth" then modern pressurized airliner cabins definitely qualify.
- dexen 7y ago>modern pressurized airliner cabins It's a good reference point, even if there are some key differences worth mentioning. First up, an airliner fuselage is specced for tens of thousands of pressure cycles; needs to sustain the wear & tear, accumulated stress, and distortion. The rocket needs to handle maybe a dozen pressure cycles at most, and it is feasible to only handle one cycle for first few experimental vehicles. Secondly, the airliner fuselage has much more complex shape, due to conflicting needs for aerodynamics, attachment of wings & control surfaces, etc.. This, together with varying materials and large openings concentrates stresses in key points. The rocket tank is as close to a big dumb uniform pipe as you can get. Even better, a rocket may rely on internal pressure for structural rigidity, while airliner needs to handle depressurization. Lastly, the Starship is designed to survive re-entry, thus heat resistance is a major concern there; not anymore for an airliner ever since the Concorde SSTO got retired.
- dexen 7y ago>where mass is the dominant cost factor. The compounding importance of mass is one factor here, but only half the story. The other half is how SpaceX' quick iterations and ability to retire vehicles early allows ample room to experiment and also to shave off safety factors. In the more mundane aerospace engineering mass is quite important, but the manufacturing, servicing, longevity etc. are pretty important considerations too. A typical airplane is designed for manufacture of some 200 ... 2000 units and to remain in use for 1 ... 3 decades. This, together with the usual requirement for human flight ratings, ends up dictating rather high safety margins for designs. Contrast that with SpaceX' vehicles which are supposed to perform a dozen unmanned flights each at most, and where one-way mission of a vehicle is a perfectly feasible strategy for testing while still making decent revenue. Quick iterations get shit done in aerospace. Among historical examples, that's how MacCready's Gossamer Albatross[1] record-breaker came to be, where other teams failed. -- [1] https://en.wikipedia.org/wiki/MacCready_Gossamer_Albatross https://en.wikipedia.org/wiki/MacCready_Gossamer_Albatross
- Ajedi32 7y agoI can't speak to how common that sort of custom tooling is in the industry, but as to whether it was necessary the article already explains that pretty clearly: > The current process for building a pressure dome takes about a week; 1 or 2 days to tack up and fit steel sheets, 4 days to weld the sheets together, and 1 to 2 days for X-ray inspections and repairs. > [...] > The knuckle seamer looks something like a giant zipper that articulates over the front and back of a dome, like a taco shell around its filling. [...] Then, in about 10 minutes, an automated torch will trace down the length of the curve, providing a precise weld. Following this, the dome is rotated to bring the next seam into view. > [...] > With this new X-ray machine, SpaceX hopes to compress a process that can take a day down to a few hours. So the new machines reduce the amount of time needed to weld and inspect a pressure dome from several days to several hours. I'm certainly no expert, but that seems like a pretty big deal to me.
- balfirevic 7y ago> Can any engineer speak to whether this is actually progress, or even necessary? No, they probably can't. It would be really weird for an outside engineer to have a better insight on this than the engineers from the actual rocket company.
- dexen 7y ago>They designed and built a custom welding machine _and_ a custom x-ray machine for building tank domes in four weeks? That's feasible due to the requirements being narrow and specific, and also well understood by a team close to the team building those machines. Contrast that with expensive & slow-to-build machines available on the general market, where the requirements are broad, under-specified, and always shifting.
- TeMPOraL 7y agoPerhaps it's a demonstration that the market should have more tools as composable building blocks, rather than turn-key solutions.
- dexen 7y ago>building blocks Yeah, we seem to have strayed a bit too much towards the turn-key end of the spectrum. IMO both have their rightful place on an open market. The problem with managing building from blocks is that it requires innovation for end results, and, as the saying goes, "Innovation is hard to schedule" (with apologies to Dan Fylstra).
- CydeWeys 7y agoIt's really helping them that they have some of the most motivated employees on Earth. Their people absolutely believe in this vision of colonizing Mars just as much as Elon Musk does. (Hell, I do too, I just don't work there.) Meanwhile I'm working at an advertising company.
- missosoup 7y ago> Meanwhile I'm working at an advertising company. That's a funny way to spell Google.
- soperj 7y agoGoogle is a funny way to spell 10^100
- riffic 7y agoyou mean Googol?
- virgilp 7y agoOr Facebook. Or heck, even Microsoft, Amazon, Adobe if you're in the "wrong" department. I bet even some Apple employees might occasionally feel they work at an advertising company.
- viklove 7y agoWell, Apple is a marketing company.
- deleted 7y ago[deleted]
- irrational 7y agoYou could set up the first billboard on Mars!
- 7y ago
- stjohnswarts 7y agoThey are definitely mad lads over at SpaceX and Tesla
- smarri 7y agoAbsolute turbo geezers
- ASalazarMX 7y agoMaybe the garbage fire that the Internet has become today was a necessary step for informatics to develop enough to tackle ambitious projects like this. Maybe all the talent that focused on computer entertainment, trading, advertising and surveillance was worth it and we'll see a second renaissance. I hope more entrepreneurs follow Elon's steps.
- shauhdej 7y agoGiven that the USA is apparently forming a Spaceforce and the long history of astronomical products becoming military products I'm surprised that more companies aren't trying to "go to Mars". Elon can probably tell that a race to be the first to expand heavily into space is coming and that even if he can't sell people on Mars he can sell tourists and the military on the moon.