3 ms·
I do think that $70/mo is reasonable per cluster but don't dismiss the value of k8s even for small projects. I used to bring a project from Ansible to k8s and e
by pckhoi 7y ago
I do think that $70/mo is reasonable per cluster but don't dismiss the value of k8s even for small projects. I used to bring a project from Ansible to k8s and even though it use only 2 nodes (~$200/mo), the tooling, the abstraction, the snappiness of gke was very much worth the switch.
- sneak 7y agoFor two nodes you need neither ansible nor k8s.